Dallas Automated Pallet Shuttle Warehouse Case Study
Case Study · Automated High-Density Storage
A 13,304-Position Automated Shuttle Warehouse, Engineered on a Live Site in Texas
How Platform 1, through its Gonvarri Constructor partnership, designed, engineered, and installed a seismic-rated automated storage structure for a new facility in the Dallas–Fort Worth area.
The challenge
A US warehouse automation integrator and its end customer, a global manufacturer of building-material systems, needed a high-density automated pallet storage system for a new facility in the Dallas–Fort Worth area. The structure had to be engineered into a purpose-built pit, receive a 4D automated shuttle system, and meet US seismic standards. All of it had to be installed on a live construction site with several trades working at once, while the racking itself was manufactured in Europe and shipped across the Atlantic in phases. It was a greenfield build with no margin for guesswork: the steel had to be right for the automation before the automation arrived.
The solution
Working through its Gonvarri Constructor partnership, Platform 1 designed and supplied a P90 adjustable pallet racking structure engineered to FEM/EN 15512 standards and rated for seismic performance. The system was purpose-built to carry the client’s automated 4D shuttle equipment across five aisles, and included a mezzanine rack level, integrated staircases, and anti-collapse mesh. Structural design and sealed drawings were completed to US code, with seismic calculations stamped by a licensed engineer. Materials were manufactured across the group’s European facilities and coordinated into a single, code-compliant system on the ground in Texas.
Execution
Delivery was phased across four shipments and roughly eighteen weeks of installation. Before work began, the team led a pre-installation site review with every trade on the project to align on pit access, delivery sequencing, power, and permitting. That coordination is what keeps a multi-trade automated build moving, and it set up the install to start clean. The racking was installed, levelled, plumbed, and grouted to tolerance, with the mezzanine, staircases, and anti-collapse mesh completed and signed off. The system was commissioned and formally accepted by the client in 2026.
The outcome
The result is a fully automated, shuttle-ready storage structure delivering 13,304 pallet positions across five aisles,* engineered to seismic standards and handed over with sealed structural documentation. It is a purpose-built greenfield system designed from the pit up to integrate with the client’s automation, not a retrofit worked around existing constraints. The structure was leveled, grouted, and signed off to specification, and commissioned for automated operation.
Why it matters
Projects like this show what Platform 1 clients reach through the Gonvarri Constructor partnership: global engineering and manufacturing capability, seismic and code expertise, and the coordination discipline to deliver enterprise-scale automated storage on a live site. Whether the project is in the Greater Toronto Area or across the border, the same engineering depth stands behind it. Racking is not a commodity. On an automated system, the structure is what determines whether the automation performs, and getting it right is the whole job.
Planning an automated or high-density storage system?
*Pallet position count is provisional pending final as-built confirmation. Project delivered through Platform 1’s Gonvarri Constructor partnership. Client shown anonymized pending naming approval.